Steel order and 22m crane lift in South East London
Our client needed steels to site promptly as the house was exposed to the elements, the ease of being able to locate the steels for install made the whole process quicker for our client.
Case study by Jamie ‘Jay’ Poole · Sales Executive Published 18 March 2026
Questions about this project?Speak to Jamie Poole, who handled this project.
Project typeA variation of fabricated and non-fabricated steel beams with 22m crane lift.
Services provided22m crane lift for installation by our customer. Supply of steel beams, one with welded shelving plate. Supply of loose connections for customer to install on site at desired location, once steels are in place
Steelwork203x203x46, 254x254x73 & 152x152x30
Our approach
Design & planning
After a few brief conversations with our client we identified the pinch points of the delivery and came up with a plausible and well-timed delivery, ensuring as little disruption to neighboring properties
Delivery & installation
Using our 22m crane lorry and the expertise of Steve, our driver/operator, the steels were lifted into position for our clients’ on-site install team to secure the steel into place.
“
MAH Steel consistently delivered high-quality structural steel and seamless crane-assisted lorry lifting on our SE18 London project—exceptional service from fabrication right through to site delivery.
Customer testimonial