Drawings and Project Preparation

Can you work directly from my structural engineer calculations?

While we can use these for quoting purposes, we require structural engineer GA (General Arrangement) drawings with measurements to produce fabrication and deliver the final product. Without these, we would have to make technical assumptions which could lead to errors; therefore, all designs must be approved by engineers before we proceed.


What are fabrication drawings and why are they necessary?

Fabrication drawings are the detailed plans used by our workshop to manufacture your steel with millimetre precision. They specify every hole and weld to ensure a perfect fit once installed on-site.


Do I need to approve the designs before manufacturing begins?

Yes, we produce general arrangement drawings for approval first. This allows you, your architect, or your structural engineer to confirm everything is correct before we proceed to fabrication.


Can MAH Steel coordinate directly with my architect or builder?

Absolutely. We work closely with your project team to resolve technical queries and ensure the steelwork integrates seamlessly into your build.


What if I am unsure about site measurements?

We recommend our site survey service. Using advanced laser scanning technology, we map your site with a high level of accuracy, which is particularly useful for loft conversions and projects within existing buildings.


Can't find the answer you're looking for?

If your question isn't covered here, our expert team is ready to help. Whether you have a complex technical query or need advice on a bespoke project, get in touch today by calling 01322 276948