Structural steel supplied and erected for an extension and refurbishment on Putney High Street

Steel for an extension to an existing building with internal refurbishment, designed in 3D, fabricated, delivered and erected by our own team.

Questions about this project?Speak to the MAH Steel team about Structural steel supplied and erected for an extension and refurbishment on Putney High Street.
Contact MAH Steel
Structural steel supplied and erected for an extension and refurbishment on Putney High Street
Location icon
LocationPutney High Street
Project type icon
Project typeExtension and refurbishment
Services provided icon
Services provided3D modelling, fabrication, delivery and erection by our own installation team
Steelwork icon
Steelwork56 tonnes of structural steel (client's figure)

Project overview

Putney High Street is undergoing refurbishment, and this project needed structural steel for a challenging extension. MAH Steel supplied and installed the steel.

Our approach

Design and detailing

Our design team created 3D drawings of the fabrication, which were sent to the client for approval. After a few amendments and tweaks we reached a fully detailed 3D model general arrangement drawing, and fabrication began.

Fabrication

The steel was cut on our CNC production line, then drilled and fabricated using the Tekla drawings and checked. It was painted in our paint booth and left to dry.

Delivery and erection

The steel was loaded onto our crane lorry and delivered to the project site, then unloaded where it was needed. Our onsite installation team erected each piece, tightening and fixing all the bolts. Our driver helped with the installation, and the steel was checked by our team and the customer before sign-off.

Outcome

  • 56 tonnes of structural steel erected in less than five weeks with our 30m crane (the client's figures)
We always used MAH Steel for all our projects that require steel work. The latest project was supply & install, was avery challenging project, new extension to existing building and refurbishment internally. Internal works was most challenging part for steel installation team which went smoothly from start to finish, 56T of structural steel erected in less than 5 weeks with their 30m crane. Nothing was too much complicated even the crane driver was mucking in with the install! I would never go anywhere else for my steel.
Customer testimonial

Gallery

Looking for trusted steel fabricators?

Let’s get in touch! Drop us a line or call 01322 276948.

Contact us
MAH Steel Ltd on Google
Excellent
MAH Steel Ltd5.0
Based on 105 reviews
Katherine Ranner on Google
Katherine Ranner
1 month ago
Paul Beaven on Google
Paul Beaven
1 month ago
Marios Syrimis on Google
Marios Syrimis
2 months ago
Alex Mcpartland on Google
Alex Mcpartland
6 months ago
Ben Edleston on Google
Ben Edleston
10 months ago
iRopeAccess LTD on Google
iRopeAccess LTD
11 months ago
Ramandeep Dosanjh on Google
Ramandeep Dosanjh
11 months ago
Asen Agov on Google
Asen Agov
11 months ago
Barrie Ball on Google
Barrie Ball
11 months ago