Project overview
One of our regular clients asked for a fabricated steel triple goalpost frame for a structural extension in Brentford. They sent the general arrangement (GA) drawing for approval, and once they gave the go-ahead we moved the order into production.
Work delivered
Fabrication
The steel sections were already in stock. Once the workshop team acknowledged the order we selected the steel and took it by forklift to the cutting area, where each piece was checked against the cutting list and sawn to length. The cut lengths went to the fabrication bays, where the fabrication and QA teams checked the measurements and finishes before work began. The ends were prepared and the end plates and connections attached. The drilling and welding followed the specifications, with checks at each stage on alignment, because a goalpost frame must bear a significant load.
Finish and delivery
The steel was sandblasted and primed, then suspended in the yard to dry. The QA team made a final visual check that everything matched the specification and that the fittings were complete, and the bolts, nuts and washers were added. We loaded the steel onto our 15-metre Hiab lorry, and our driver checked the load before an early delivery. On site the steel was craned directly into position where the customer needed it.
Outcome
- Steel craned directly into position where the customer needed it
Nick and the team at MAH Steel always go the extra mile and are accurate, fast, supremely well priced and we simply won’t use anyone else, we tried toiled before using MAH Steel with different suppliers – no one comes close!
Gallery
Need reliable steel fabrication in Brentford?
Get in touch with MAH Steel today for expert service, fast turnaround, and quality you can trust.
Contact us
